Cerro Gordo Wind Farm (63287_CGWF)

Cerro Gordo Wind Farm is a 42.0 MW wind interconnection project in Cerro Gordo, Iowa with a current status of operational.

42.0 MWCapacity
OperationalStatus
MISOMarket
WindTechnology

Project facts

Canonical nameCerro Gordo Wind Farm
Queue ID63287_CGWF
Statusoperational
Source status(OP) Operating
MarketMISO
TechnologyWind
Capacity42.0 MW
StateIowa
CountyCerro Gordo
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2020-08-01
Withdrawn date—
Developer—
Utility / transmission ownerCerro Gordo Wind Farm

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-11-01
Data last materially changed2026-11-01
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata