CGS Distribution Substation (L0582)

CGS Distribution Substation is a 70.0 MW other interconnection project in Benton, Washington with a current status of active. It is proposed to connect at Benton-White Bluffs No 2 115 kV line.

70.0 MWCapacity
ActiveStatus
WAMarket
OtherTechnology

Project facts

Canonical nameCGS Distribution Substation
Queue IDL0582
Statusactive
Source statusSTUDY
MarketWA
TechnologyOther
Capacity70.0 MW
StateWashington
CountyBenton
Point of interconnectionBenton-White Bluffs No 2 115 kV line
Requested (queue) date2023-10-02
Proposed in-service date2028-07-07
Operational date
Withdrawn date
DeveloperEnergy Efficiency Solar, Inc. dba ACRO Energy Inc.
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata