CGS Distribution Substation (L0582)
CGS Distribution Substation is a 70.0 MW other interconnection project in Benton, Washington with a current status of active. It is proposed to connect at Benton-White Bluffs No 2 115 kV line.
70.0 MWCapacity
ActiveStatus
WAMarket
OtherTechnology
Project facts
| Canonical name | CGS Distribution Substation |
|---|---|
| Queue ID | L0582 |
| Status | active |
| Source status | STUDY |
| Market | WA |
| Technology | Other |
| Capacity | 70.0 MW |
| State | Washington |
| County | Benton |
| Point of interconnection | Benton-White Bluffs No 2 115 kV line |
| Requested (queue) date | 2023-10-02 |
| Proposed in-service date | 2028-07-07 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Energy Efficiency Solar, Inc. dba ACRO Energy Inc. |
| Utility / transmission owner | Bonneville Power Administration |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.