CHACKBAY - VACHERIE 230.0kV (R5083)

CHACKBAY - VACHERIE 230.0kV is a 135.0 MW battery interconnection project in St. James, Louisiana with a current status of operational. It is proposed to connect at CHACKBAY - VACHERIE 230.0kV.

135.0 MWCapacity
OperationalStatus
—Market
BatteryTechnology

Project facts

Canonical nameCHACKBAY - VACHERIE 230.0kV
Queue IDR5083
Statusoperational
Source statusActive
Market—
TechnologyBattery
Capacity135.0 MW
StateLouisiana
CountySt. James
Point of interconnectionCHACKBAY - VACHERIE 230.0kV
Requested (queue) date2025-09-30
Proposed in-service date2026-06-01
Operational date2026-06-01
Withdrawn date—
Developer—
Utility / transmission ownerENTERGY ARKANSAS

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—operationalhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata