Chalk Point Power is a 659.0 MW gas interconnection project in Prince Georges, Maryland with a current status of operational.

659.0 MWCapacity
OperationalStatus
PJMMarket
GasTechnology

Project facts

Canonical nameChalk Point Power
Queue ID1571_4
Statusoperational
Source status(OP) Operating
MarketPJM
TechnologyGas
Capacity659.0 MW
StateMaryland
CountyPrince Georges
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date1981-12-01
Withdrawn date—
Developer—
Utility / transmission ownerChalk Point Power, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.