Charles County 13 kV (AE1-082)

Charles County 13 kV is a 1.2 MW solar interconnection project in Charles, Maryland with a current status of withdrawn.

1.2 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameCharles County 13 kV
Queue IDAE1-082
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity1.2 MW
StateMaryland
CountyCharles
Point of interconnection
Requested (queue) date2018-08-28
Proposed in-service date2018-11-30
Operational date
Withdrawn date2018-09-13
Developer
Utility / transmission ownerSMECO

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata