Chase Hill - NG WRI DG Area Study #2 <5 MW (1043)
Chase Hill - NG WRI DG Area Study #2 <5 MW is a 7.3 MW solar interconnection project in Washington, Rhode Island with a current status of withdrawn. It is proposed to connect at NG Chase Hillk substation.
7.3 MWCapacity
WithdrawnStatus
RIMarket
SolarTechnology
Project facts
| Canonical name | Chase Hill - NG WRI DG Area Study #2 <5 MW |
|---|---|
| Queue ID | 1043 |
| Status | withdrawn |
| Source status | W |
| Market | RI |
| Technology | Solar |
| Capacity | 7.3 MW |
| State | Rhode Island |
| County | Washington |
| Point of interconnection | NG Chase Hillk substation |
| Requested (queue) date | 2020-08-19 |
| Proposed in-service date | 2025-06-30 |
| Operational date | — |
| Withdrawn date | 2024-10-08 |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata