Chase Hill Substation - NG Western RI DG Area Study (959)

Chase Hill Substation - NG Western RI DG Area Study is a 6.8 MW solar interconnection project in Washington, Rhode Island with a current status of operational. It is proposed to connect at NG feeder 88F1, Chase Hill Substation.

6.8 MWCapacity
OperationalStatus
RIMarket
SolarTechnology

Project facts

Canonical nameChase Hill Substation - NG Western RI DG Area Study
Queue ID959
Statusoperational
Source statusC
MarketRI
TechnologySolar
Capacity6.8 MW
StateRhode Island
CountyWashington
Point of interconnectionNG feeder 88F1, Chase Hill Substation
Requested (queue) date2020-03-18
Proposed in-service date
Operational date2021-08-15
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata