Chatham is a 3.7 MW gas interconnection project in Kent, Michigan with a current status of operational.

3.7 MWCapacity
OperationalStatus
MISOMarket
GasTechnology

Project facts

Canonical nameChatham
Queue ID58254_CTOIS
Statusoperational
Source status(OP) Operating
MarketMISO
TechnologyGas
Capacity3.7 MW
StateMichigan
CountyKent
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2013-09-01
Withdrawn date—
Developer—
Utility / transmission ownerCity of Lowell - (MI)

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-11

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata