Chaves County - San Juan Wind 230 kV Line (GEN-2024-271)
Chaves County - San Juan Wind 230 kV Line is a 250.0 MW solar interconnection project in Chaves, New Mexico with a current status of withdrawn. It is proposed to connect at Chaves County - San Juan Wind 230 kV Line.
250.0 MWCapacity
WithdrawnStatus
NMMarket
SolarTechnology
Project facts
| Canonical name | Chaves County - San Juan Wind 230 kV Line |
|---|---|
| Queue ID | GEN-2024-271 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | NM |
| Technology | Solar |
| Capacity | 250.0 MW |
| State | New Mexico |
| County | Chaves |
| Point of interconnection | Chaves County - San Juan Wind 230 kV Line |
| Requested (queue) date | 2025-03-01 |
| Proposed in-service date | 2029-12-15 |
| Operational date | — |
| Withdrawn date | 2026-05-21 |
| Developer | — |
| Utility / transmission owner | SPS |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata