Cherry Point Refinery (G27-01)

Cherry Point Refinery is a 1,000.0 MW gas interconnection project in Whatcom, Washington with a current status of withdrawn. It is proposed to connect at Custer Substation.

1,000.0 MWCapacity
WithdrawnStatus
WAMarket
GasTechnology

Project facts

Canonical nameCherry Point Refinery
Queue IDG27-01
Statuswithdrawn
Source statusWITHDRAWN
MarketWA
TechnologyGas
Capacity1,000.0 MW
StateWashington
CountyWhatcom
Point of interconnectionCuster Substation
Requested (queue) date2001-02-20
Proposed in-service date2004-01-01
Operational date
Withdrawn date
DeveloperBP Wind Energy North America, Inc
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata