Chestertown 69kV (X3-074)

Chestertown 69kV is a 11.9 MW solar interconnection project in Kent, Maryland with a current status of withdrawn.

11.9 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameChestertown 69kV
Queue IDX3-074
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity11.9 MW
StateMaryland
CountyKent
Point of interconnection—
Requested (queue) date2011-10-28
Proposed in-service date2013-03-31
Operational date—
Withdrawn date2012-08-15
Developer—
Utility / transmission ownerDPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.