Chevelon Butte Phase 2 (67176_CHVB2)

Chevelon Butte Phase 2 is a 216.0 MW wind interconnection project in Coconino, Arizona with a current status of operational.

216.0 MWCapacity
OperationalStatus
AZPSMarket
WindTechnology

Project facts

Canonical nameChevelon Butte Phase 2
Queue ID67176_CHVB2
Statusoperational
Source status(OP) Operating
MarketAZPS
TechnologyWind
Capacity216.0 MW
StateArizona
CountyCoconino
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2024-04-01
Withdrawn date—
Developer—
Utility / transmission ownerAES Clean Energy

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.