Chicken Creek Substation (L0390)

Chicken Creek Substation is a 10.0 MW other interconnection project in Okanogan, Washington with a current status of operational. It is proposed to connect at East Omak Tap of the Grand Coulee Foster Creek #1 115kV Line.

10.0 MWCapacity
OperationalStatus
WAMarket
OtherTechnology

Project facts

Canonical nameChicken Creek Substation
Queue IDL0390
Statusoperational
Source statusENERGIZED
MarketWA
TechnologyOther
Capacity10.0 MW
StateWashington
CountyOkanogan
Point of interconnectionEast Omak Tap of the Grand Coulee Foster Creek #1 115kV Line
Requested (queue) date2015-09-28
Proposed in-service date
Operational date2018-10-01
Withdrawn date
DeveloperNespelem Valley Electric Cooperative, Inc.
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata