Chicken Farm - Amite 115 kV Line (J1257)

Chicken Farm - Amite 115 kV Line is a 20.0 MW battery interconnection project in Tangipahoa Parish, Louisiana with a current status of operational. It is proposed to connect at Chicken Farm - Amite 115 kV Line.

20.0 MWCapacity
OperationalStatus
Market
BatteryTechnology

Project facts

Canonical nameChicken Farm - Amite 115 kV Line
Queue IDJ1257
Statusoperational
Source statusDone
Market
TechnologyBattery
Capacity20.0 MW
StateLouisiana
CountyTangipahoa Parish
Point of interconnectionChicken Farm - Amite 115 kV Line
Requested (queue) date2019-04-29
Proposed in-service date2022-10-30
Operational date2022-10-30
Withdrawn date
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.