Chigley 138 kV Substation (GEN-2024-163)

Chigley 138 kV Substation is a 199.0 MW battery interconnection project in Garvin, Oklahoma with a current status of withdrawn. It is proposed to connect at Chigley 138 kV Substation.

199.0 MWCapacity
WithdrawnStatus
OKMarket
BatteryTechnology

Project facts

Canonical nameChigley 138 kV Substation
Queue IDGEN-2024-163
Statuswithdrawn
Source statusWITHDRAWN
MarketOK
TechnologyBattery
Capacity199.0 MW
StateOklahoma
CountyGarvin
Point of interconnectionChigley 138 kV Substation
Requested (queue) date2025-03-01
Proposed in-service date2030-01-15
Operational date
Withdrawn date
Developer
Utility / transmission ownerOGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.