Chino Mines (54667_9)

Chino Mines is a 37.5 MW gas interconnection project in Grant, New Mexico with a current status of operational.

37.5 MWCapacity
OperationalStatus
PNMMarket
GasTechnology

Project facts

Canonical nameChino Mines
Queue ID54667_9
Statusoperational
Source status(SB) Standby/Backup: available for service but not normally used
MarketPNM
TechnologyGas
Capacity37.5 MW
StateNew Mexico
CountyGrant
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2001-07-01
Withdrawn date
Developer
Utility / transmission ownerFreePort-McMoRan-Corp-Chino Mines

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.