Choptank Solar and Storage (AG1-450)

Choptank Solar and Storage is a 25.0 MW battery interconnection project in Dorchester, Maryland with a current status of withdrawn. It is proposed to connect at Airey-Vienna 69 kV II.

25.0 MWCapacity
WithdrawnStatus
PJMMarket
BatteryTechnology

Project facts

Canonical nameChoptank Solar and Storage
Queue IDAG1-450
Statuswithdrawn
Source statuswithdrawn
MarketPJM
TechnologyBattery
Capacity25.0 MW
StateMaryland
CountyDorchester
Point of interconnectionAirey-Vienna 69 kV II
Requested (queue) date2020-09-30
Proposed in-service date2022-12-31
Operational date
Withdrawn date2025-11-03
DeveloperRWE Solar Development, LLC
Utility / transmission ownerDPL

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.