Christmiller Solar (1173)

Christmiller Solar is a 20.0 MW other interconnection project in Cattaraugus, New York with a current status of withdrawn. It is proposed to connect at Dake Hill – Machias 34.5kV.

20.0 MWCapacity
WithdrawnStatus
AMarket
OtherTechnology

Project facts

Canonical nameChristmiller Solar
Queue ID1173
Statuswithdrawn
Source status0
MarketA
TechnologyOther
Capacity20.0 MW
StateNew York
CountyCattaraugus
Point of interconnectionDake Hill – Machias 34.5kV
Requested (queue) date2021-05-17
Proposed in-service date2022-12-31
Operational date
Withdrawn date
DeveloperNorthland Power U.S. Projects
Utility / transmission ownerNM-NG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.