Church Hill 69kV is a 6.0 MW solar interconnection project in Queen Anne's, Maryland with a current status of operational.

6.0 MWCapacity
OperationalStatus
—Market
SolarTechnology

Project facts

Canonical nameChurch Hill 69kV
Queue IDX3-066
Statusoperational
Source statusIn Service
Market—
TechnologySolar
Capacity6.0 MW
StateMaryland
CountyQueen Anne's
Point of interconnection—
Requested (queue) date2011-10-13
Proposed in-service date—
Operational date2015-09-01
Withdrawn date—
Developer—
Utility / transmission ownerDPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—operationalhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.