Church-Wye Mills 138 kV (AB2-153)

Church-Wye Mills 138 kV is a 20.0 MW solar interconnection project in Queen Anne's, Maryland with a current status of operational.

20.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameChurch-Wye Mills 138 kV
Queue IDAB2-153
Statusoperational
Source statusIn Service
Market
TechnologySolar
Capacity20.0 MW
StateMaryland
CountyQueen Anne's
Point of interconnection
Requested (queue) date2016-04-29
Proposed in-service date
Operational date2023-12-31
Withdrawn date
Developer
Utility / transmission ownerDPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata