Cineguilla Project (SGI-PNM-2008-05)

Cineguilla Project is a 2.0 MW solar interconnection project in Santa Fe, New Mexico with a current status of withdrawn. It is proposed to connect at Becker Substation Feeder 13.

2.0 MWCapacity
WithdrawnStatus
WestMarket
SolarTechnology

Project facts

Canonical nameCineguilla Project
Queue IDSGI-PNM-2008-05
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologySolar
Capacity2.0 MW
StateNew Mexico
CountySanta Fe
Point of interconnectionBecker Substation Feeder 13
Requested (queue) date2008-10-13
Proposed in-service date2014-06-01
Operational date
Withdrawn date
DeveloperenXco Dev. Corp
Utility / transmission ownerPublic Service Company of New Mexico

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.