Clare Jct to Vernon Jct 138 kV (J2494)

Clare Jct to Vernon Jct 138 kV is a 178.0 MW solar interconnection project in Midland, Michigan with a current status of withdrawn. It is proposed to connect at Clare Jct to Vernon Jct 138 kV.

178.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameClare Jct to Vernon Jct 138 kV
Queue IDJ2494
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity178.0 MW
StateMichigan
CountyMidland
Point of interconnectionClare Jct to Vernon Jct 138 kV
Requested (queue) date2022-09-14
Proposed in-service date2025-11-01
Operational date2025-11-01
Withdrawn date2023-03-24
Developer—
Utility / transmission ownerMETC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-10-31phasePhase 2Phase 3low
2026-10-14phasePhase 1Phase 2low
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata