Clarinda - Braddyville 161 kV line (J2166)

Clarinda - Braddyville 161 kV line is a 200.0 MW solar interconnection project in Taylor, Iowa with a current status of withdrawn. It is proposed to connect at Clarinda - Braddyville 161 kV line.

200.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameClarinda - Braddyville 161 kV line
Queue IDJ2166
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity200.0 MW
StateIowa
CountyTaylor
Point of interconnectionClarinda - Braddyville 161 kV line
Requested (queue) date2021-08-17
Proposed in-service date2025-04-01
Operational date2025-04-01
Withdrawn date2021-12-09
Developer
Utility / transmission ownerMIDAMERICAN ENERGY CO.

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata