Clear River (489)

Clear River is a 1,030.0 MW gas interconnection project in Providence, Rhode Island with a current status of withdrawn. It is proposed to connect at Sherman Road 345kV Station.

1,030.0 MWCapacity
WithdrawnStatus
RIMarket
GasTechnology

Project facts

Canonical nameClear River
Queue ID489
Statuswithdrawn
Source statusW
MarketRI
TechnologyGas
Capacity1,030.0 MW
StateRhode Island
CountyProvidence
Point of interconnectionSherman Road 345kV Station
Requested (queue) date2015-01-08
Proposed in-service date2022-05-31
Operational date
Withdrawn date2019-11-26
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata