Clinton II Windfield (0211)
Clinton II Windfield is a 21.0 MW wind interconnection project in Clinton, New York with a current status of operational. It is proposed to connect at Willis-Plattsburgh WP-2 230kV.
21.0 MWCapacity
OperationalStatus
DMarket
WindTechnology
Project facts
| Canonical name | Clinton II Windfield |
|---|---|
| Queue ID | 0211 |
| Status | operational |
| Source status | 14 |
| Market | D |
| Technology | Wind |
| Capacity | 21.0 MW |
| State | New York |
| County | Clinton |
| Point of interconnection | Willis-Plattsburgh WP-2 230kV |
| Requested (queue) date | 2006-04-03 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | Noble Environmental Power, LLC |
| Utility / transmission owner | NYPA |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata