Clinton – Stilwell 161 kV Line Tap (GEN-2017-111)

Clinton – Stilwell 161 kV Line Tap is a 152.0 MW solar interconnection project in Bates, Missouri with a current status of withdrawn. It is proposed to connect at Clinton – Stilwell 161 kV Line Tap.

152.0 MWCapacity
WithdrawnStatus
MOMarket
SolarTechnology

Project facts

Canonical nameClinton – Stilwell 161 kV Line Tap
Queue IDGEN-2017-111
Statuswithdrawn
Source statusWITHDRAWN
MarketMO
TechnologySolar
Capacity152.0 MW
StateMissouri
CountyBates
Point of interconnectionClinton – Stilwell 161 kV Line Tap
Requested (queue) date2017-11-27
Proposed in-service date2024-12-31
Operational date
Withdrawn date2023-08-24
Developer
Utility / transmission ownerKCPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata