Clodfelter Substation (L0371)

Clodfelter Substation is a 11.0 MW other interconnection project in Franklin, Washington with a current status of withdrawn. It is proposed to connect at BPA's Franklin-Badger Canyon #1 115kV line.

11.0 MWCapacity
WithdrawnStatus
WAMarket
OtherTechnology

Project facts

Canonical nameClodfelter Substation
Queue IDL0371
Statuswithdrawn
Source statusWITHDRAWN
MarketWA
TechnologyOther
Capacity11.0 MW
StateWashington
CountyFranklin
Point of interconnectionBPA's Franklin-Badger Canyon #1 115kV line
Requested (queue) date2014-06-03
Proposed in-service date2017-10-01
Operational date
Withdrawn date
DeveloperPublic Utility District No. 1 of Cowlitz County
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata