CMP Lakewood 115 kV SS - Winslow-Lakewood Areas Study (1095)

CMP Lakewood 115 kV SS - Winslow-Lakewood Areas Study is a 28.7 MW solar interconnection project in Somerset, Maine with a current status of withdrawn. It is proposed to connect at CMP Lakewood 115 kV SS.

28.7 MWCapacity
WithdrawnStatus
MEMarket
SolarTechnology

Project facts

Canonical nameCMP Lakewood 115 kV SS - Winslow-Lakewood Areas Study
Queue ID1095
Statuswithdrawn
Source statusW
MarketME
TechnologySolar
Capacity28.7 MW
StateMaine
CountySomerset
Point of interconnectionCMP Lakewood 115 kV SS
Requested (queue) date2021-02-04
Proposed in-service date2024-04-30
Operational date
Withdrawn date2025-06-13
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata