CO Queue Project GI-CS-2025-18 — Wind in Union County, New Mexico

CO Queue Project GI-CS-2025-18 — Wind in Union County, New Mexico is a 199.0 MW wind interconnection project in Union County, New Mexico with a current status of withdrawn. It is proposed to connect at Clapman - Gladstone 115kV Line.

199.0 MWCapacity
WithdrawnStatus
COMarket
WindTechnology

Project facts

Canonical nameCO Queue Project GI-CS-2025-18 — Wind in Union County, New Mexico
Queue IDGI-CS-2025-18
Statuswithdrawn
Source statusWithdrawn
MarketCO
TechnologyWind
Capacity199.0 MW
StateNew Mexico
CountyUnion County
Point of interconnectionClapman - Gladstone 115kV Line
Requested (queue) date2025-09-26
Proposed in-service date2029-12-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerTri-State Generation and Transmission Association

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-21statusactivewithdrawnhigh
2026-08-17phase—Cluster Study Reportlow
2026-08-02new_project—activehigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: tristate-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata