CO Queue Project GI-CS-2025-18 — Wind in Union County, New Mexico
CO Queue Project GI-CS-2025-18 — Wind in Union County, New Mexico is a 199.0 MW wind interconnection project in Union County, New Mexico with a current status of active. It is proposed to connect at Clapman - Gladstone 115kV Line.
199.0 MWCapacity
ActiveStatus
COMarket
WindTechnology
Project facts
| Canonical name | CO Queue Project GI-CS-2025-18 — Wind in Union County, New Mexico |
|---|---|
| Queue ID | GI-CS-2025-18 |
| Status | active |
| Source status | Cluster Study |
| Market | CO |
| Technology | Wind |
| Capacity | 199.0 MW |
| State | New Mexico |
| County | Union County |
| Point of interconnection | Clapman - Gladstone 115kV Line |
| Requested (queue) date | 2025-09-26 |
| Proposed in-service date | 2029-12-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Tri-State Generation and Transmission Association |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-17 | phase | — | Cluster Study Report | low |
| 2026-08-02 | new_project | — | active | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: tristate-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.