CO Queue Project GI-TC-2024-27 — Wind in Sherman And Wallace Counties, Kansas
CO Queue Project GI-TC-2024-27 — Wind in Sherman And Wallace Counties, Kansas is a 298.0 MW wind interconnection project in Sherman And Wallace Counties, Kansas with a current status of withdrawn. It is proposed to connect at Burlington 230 kV Substation.
298.0 MWCapacity
WithdrawnStatus
COMarket
WindTechnology
Project facts
| Canonical name | CO Queue Project GI-TC-2024-27 — Wind in Sherman And Wallace Counties, Kansas |
|---|---|
| Queue ID | GI-TC-2024-27 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | CO |
| Technology | Wind |
| Capacity | 298.0 MW |
| State | Kansas |
| County | Sherman And Wallace Counties |
| Point of interconnection | Burlington 230 kV Substation |
| Requested (queue) date | 2023-05-30 |
| Proposed in-service date | 2028-12-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Tri-State Generation and Transmission Association |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-02 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: tristate-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata