Coastal Energy Project (G0407)

Coastal Energy Project is a 6.0 MW wind interconnection project in Grays Harbor, Washington with a current status of operational. It is proposed to connect at Grays Harbor PUD 15 kV Distribution Pole Number P1/64.

6.0 MWCapacity
OperationalStatus
WAMarket
WindTechnology

Project facts

Canonical nameCoastal Energy Project
Queue IDG0407
Statusoperational
Source statusENERGIZED
MarketWA
TechnologyWind
Capacity6.0 MW
StateWashington
CountyGrays Harbor
Point of interconnectionGrays Harbor PUD 15 kV Distribution Pole Number P1/64
Requested (queue) date2010-02-04
Proposed in-service date
Operational date2010-05-17
Withdrawn date
DeveloperCoastal Energy Project, LLC
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata