Cobb - Archer Junction 138kV #2 (J1580)

Cobb - Archer Junction 138kV #2 is a 100.0 MW solar interconnection project in Ottawa, Michigan with a current status of withdrawn. It is proposed to connect at Cobb - Archer Junction 138kV #2.

100.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameCobb - Archer Junction 138kV #2
Queue IDJ1580
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity100.0 MW
StateMichigan
CountyOttawa
Point of interconnectionCobb - Archer Junction 138kV #2
Requested (queue) date2020-06-19
Proposed in-service date2023-10-01
Operational date2023-10-01
Withdrawn date2020-11-30
Developer
Utility / transmission ownerMETC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.