Cody Road (0739)

Cody Road is a 19.9 MW wind interconnection project in Madison, New York with a current status of withdrawn. It is proposed to connect at Fenner - Cortland 115kV.

19.9 MWCapacity
WithdrawnStatus
CMarket
WindTechnology

Project facts

Canonical nameCody Road
Queue ID0739
Statuswithdrawn
Source status0
MarketC
TechnologyWind
Capacity19.9 MW
StateNew York
CountyMadison
Point of interconnectionFenner - Cortland 115kV
Requested (queue) date2018-06-12
Proposed in-service date2019-07-31
Operational date
Withdrawn date
DeveloperHecate Energy
Utility / transmission ownerNM-NG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.