Colchester 16 (3735_GT1)

Colchester 16 is a 18.0 MW other interconnection project in Chittenden, Vermont with a current status of operational.

18.0 MWCapacity
OperationalStatus
ISNEMarket
OtherTechnology

Project facts

Canonical nameColchester 16
Queue ID3735_GT1
Statusoperational
Source status(OP) Operating
MarketISNE
TechnologyOther
Capacity18.0 MW
StateVermont
CountyChittenden
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date1965-10-01
Withdrawn date
Developer
Utility / transmission ownerGreen Mountain Power Corp

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata