COLDWATER - MOORE ROAD 138.0kV (J3924)

COLDWATER - MOORE ROAD 138.0kV is a 80.0 MW battery interconnection project in Branch, Michigan with a current status of operational. It is proposed to connect at COLDWATER - MOORE ROAD 138.0kV.

80.0 MWCapacity
OperationalStatus
Market
BatteryTechnology

Project facts

Canonical nameCOLDWATER - MOORE ROAD 138.0kV
Queue IDJ3924
Statusoperational
Source statusActive
Market
TechnologyBattery
Capacity80.0 MW
StateMichigan
CountyBranch
Point of interconnectionCOLDWATER - MOORE ROAD 138.0kV
Requested (queue) date2025-03-05
Proposed in-service date2030-10-01
Operational date2030-10-01
Withdrawn date
Developer
Utility / transmission ownerMETC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.