COLFAX - MADRID 120.0kV (J2997)

COLFAX - MADRID 120.0kV is a 160.0 MW battery interconnection project in Livingston, Michigan with a current status of withdrawn. It is proposed to connect at COLFAX - MADRID 120.0kV.

160.0 MWCapacity
WithdrawnStatus
—Market
BatteryTechnology

Project facts

Canonical nameCOLFAX - MADRID 120.0kV
Queue IDJ2997
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyBattery
Capacity160.0 MW
StateMichigan
CountyLivingston
Point of interconnectionCOLFAX - MADRID 120.0kV
Requested (queue) date2022-09-14
Proposed in-service date2025-09-15
Operational date2025-09-15
Withdrawn date2026-10-20
Developer—
Utility / transmission ownerITC MIDWEST

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-11-05withdrawn_date—2026-10-20high
2026-11-05statusoperationalwithdrawnhigh
2026-10-31phasePhase 2Phase 3low
2026-10-14phasePhase 1Phase 2low
2026-07-29new_project—operationalhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata