COLFAX to Madrid 120 kV (J2679)

COLFAX to Madrid 120 kV is a 100.0 MW solar interconnection project in Livingston, Michigan with a current status of withdrawn. It is proposed to connect at COLFAX to Madrid 120 kV.

100.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameCOLFAX to Madrid 120 kV
Queue IDJ2679
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity100.0 MW
StateMichigan
CountyLivingston
Point of interconnectionCOLFAX to Madrid 120 kV
Requested (queue) date2022-09-14
Proposed in-service date2027-04-15
Operational date2027-04-15
Withdrawn date2026-10-20
Developer—
Utility / transmission ownerITC MIDWEST

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-11-05withdrawn_date—2026-10-20high
2026-11-05statusoperationalwithdrawnhigh
2026-10-31phasePhase 2Phase 3low
2026-10-14phasePhase 1Phase 2low
2026-07-29new_project—operationalhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.