Colonial Pipeline - Kentwood 115 kV Line (J1223)

Colonial Pipeline - Kentwood 115 kV Line is a 150.0 MW solar interconnection project in Pike County, Mississippi with a current status of withdrawn. It is proposed to connect at Colonial Pipeline - Kentwood 115 kV Line.

150.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameColonial Pipeline - Kentwood 115 kV Line
Queue IDJ1223
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity150.0 MW
StateMississippi
CountyPike County
Point of interconnectionColonial Pipeline - Kentwood 115 kV Line
Requested (queue) date2019-04-27
Proposed in-service date2023-10-30
Operational date2023-10-30
Withdrawn date2021-03-18
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata