COLONIAL WELSH 138 (J2701)

COLONIAL WELSH 138 is a 100.0 MW solar interconnection project in Jefferson Davis, Louisiana with a current status of operational. It is proposed to connect at COLONIAL WELSH 138.

100.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameCOLONIAL WELSH 138
Queue IDJ2701
Statusoperational
Source statusActive
Market
TechnologySolar
Capacity100.0 MW
StateLouisiana
CountyJefferson Davis
Point of interconnectionCOLONIAL WELSH 138
Requested (queue) date2022-09-14
Proposed in-service date2027-04-15
Operational date2027-04-15
Withdrawn date
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.