Columbia SW YD(ALTE) - South Fond Du Lac SW YD 345 KV T-Line (J1629)

Columbia SW YD(ALTE) - South Fond Du Lac SW YD 345 KV T-Line is a 200.0 MW solar interconnection project in Columbia, Wisconsin with a current status of operational. It is proposed to connect at Columbia SW YD(ALTE) - South Fond Du Lac SW YD 345 KV T-Line.

200.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameColumbia SW YD(ALTE) - South Fond Du Lac SW YD 345 KV T-Line
Queue IDJ1629
Statusoperational
Source statusDone
Market
TechnologySolar
Capacity200.0 MW
StateWisconsin
CountyColumbia
Point of interconnectionColumbia SW YD(ALTE) - South Fond Du Lac SW YD 345 KV T-Line
Requested (queue) date2020-06-22
Proposed in-service date2024-07-18
Operational date2024-07-18
Withdrawn date
Developer
Utility / transmission ownerAMERICAN TRANSMISSION COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.