Combined Cycle Capacity Increase/ Generator Change (226)

Combined Cycle Capacity Increase/ Generator Change is a 904.0 MW gas interconnection project in Rockingham, New Hampshire with a current status of withdrawn. It is proposed to connect at 345 kV Seabrook Substation.

904.0 MWCapacity
WithdrawnStatus
NHMarket
GasTechnology

Project facts

Canonical nameCombined Cycle Capacity Increase/ Generator Change
Queue ID226
Statuswithdrawn
Source statusW
MarketNH
TechnologyGas
Capacity904.0 MW
StateNew Hampshire
CountyRockingham
Point of interconnection345 kV Seabrook Substation
Requested (queue) date2007-09-05
Proposed in-service date2013-06-30
Operational date
Withdrawn date2009-07-14
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata