Combined Cycle Capacity Increase/ Generator Change (226)
Combined Cycle Capacity Increase/ Generator Change is a 904.0 MW gas interconnection project in Rockingham, New Hampshire with a current status of withdrawn. It is proposed to connect at 345 kV Seabrook Substation.
904.0 MWCapacity
WithdrawnStatus
NHMarket
GasTechnology
Project facts
| Canonical name | Combined Cycle Capacity Increase/ Generator Change |
|---|---|
| Queue ID | 226 |
| Status | withdrawn |
| Source status | W |
| Market | NH |
| Technology | Gas |
| Capacity | 904.0 MW |
| State | New Hampshire |
| County | Rockingham |
| Point of interconnection | 345 kV Seabrook Substation |
| Requested (queue) date | 2007-09-05 |
| Proposed in-service date | 2013-06-30 |
| Operational date | — |
| Withdrawn date | 2009-07-14 |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata