Combined Cycle CNR (705)

Combined Cycle CNR is a 1,030.0 MW gas interconnection project in Providence, Rhode Island with a current status of withdrawn. It is proposed to connect at Sherman Road 345kV substation.

1,030.0 MWCapacity
WithdrawnStatus
RIMarket
GasTechnology

Project facts

Canonical nameCombined Cycle CNR
Queue ID705
Statuswithdrawn
Source statusW
MarketRI
TechnologyGas
Capacity1,030.0 MW
StateRhode Island
CountyProvidence
Point of interconnectionSherman Road 345kV substation
Requested (queue) date2018-01-26
Proposed in-service date2023-05-31
Operational date
Withdrawn date2019-11-26
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata