Combined Cycle (261)

Combined Cycle is a 221.6 MW gas interconnection project with a current status of withdrawn. It is proposed to connect at Yarmouth Substation 115 kV bus.

221.6 MWCapacity
WithdrawnStatus
MEMarket
GasTechnology

Project facts

Canonical nameCombined Cycle
Queue ID261
Statuswithdrawn
Source statusW
MarketME
TechnologyGas
Capacity221.6 MW
StateMaine
County
Point of interconnectionYarmouth Substation 115 kV bus
Requested (queue) date2008-05-19
Proposed in-service date2013-12-31
Operational date
Withdrawn date2008-11-07
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.