Combined Cycle( see # 201) (164)

Combined Cycle( see # 201) is a 320.0 MW gas interconnection project in Providence, Rhode Island with a current status of withdrawn. It is proposed to connect at 345 kV RISE Substation.

320.0 MWCapacity
WithdrawnStatus
RIMarket
GasTechnology

Project facts

Canonical nameCombined Cycle( see # 201)
Queue ID164
Statuswithdrawn
Source statusW
MarketRI
TechnologyGas
Capacity320.0 MW
StateRhode Island
CountyProvidence
Point of interconnection345 kV RISE Substation
Requested (queue) date2006-08-01
Proposed in-service date2012-06-01
Operational date
Withdrawn date2009-12-14
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata