Combined Cycle( See # 226) (165)

Combined Cycle( See # 226) is a 563.0 MW gas interconnection project in Rockingham, New Hampshire with a current status of withdrawn. It is proposed to connect at 345 kV Seabrook Substation.

563.0 MWCapacity
WithdrawnStatus
NHMarket
GasTechnology

Project facts

Canonical nameCombined Cycle( See # 226)
Queue ID165
Statuswithdrawn
Source statusW
MarketNH
TechnologyGas
Capacity563.0 MW
StateNew Hampshire
CountyRockingham
Point of interconnection345 kV Seabrook Substation
Requested (queue) date2006-08-03
Proposed in-service date2013-06-30
Operational date
Withdrawn date2009-04-10
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata