Combustion Turbine (Alt to Q523) (524)
Combustion Turbine (Alt to Q523) is a 226.5 MW gas interconnection project in Providence, Rhode Island with a current status of withdrawn. It is proposed to connect at Both National Grid 115kV lines S171 and T172 south of the Rhode Island State Energy tap..
226.5 MWCapacity
WithdrawnStatus
RIMarket
GasTechnology
Project facts
| Canonical name | Combustion Turbine (Alt to Q523) |
|---|---|
| Queue ID | 524 |
| Status | withdrawn |
| Source status | W |
| Market | RI |
| Technology | Gas |
| Capacity | 226.5 MW |
| State | Rhode Island |
| County | Providence |
| Point of interconnection | Both National Grid 115kV lines S171 and T172 south of the Rhode Island State Energy tap. |
| Requested (queue) date | 2015-02-23 |
| Proposed in-service date | 2019-05-01 |
| Operational date | — |
| Withdrawn date | 2015-03-31 |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata