Con Edison Storage LDG-00556 (LDG-00556)

Con Edison Storage LDG-00556 is a 1.0 MW battery interconnection project in Richmond, New York with a current status of operational. It is proposed to connect at Fresh Kills / 210.

1.0 MWCapacity
OperationalStatus
Staten IslandMarket
BatteryTechnology

Project facts

Canonical nameCon Edison Storage LDG-00556
Queue IDLDG-00556
Statusoperational
Source statusInterconnected
MarketStaten Island
TechnologyBattery
Capacity1.0 MW
StateNew York
CountyRichmond
Point of interconnectionFresh Kills / 210
Requested (queue) date
Proposed in-service date
Operational date2020-02-05
Withdrawn date
DeveloperGI Energy
Utility / transmission ownerCon Edison

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-05new_projectoperationalhigh

Explore related data

Source last checked2026-08-05
Data last materially changed2026-08-05
Page data generated2026-08-27

Provenance: ny-storage. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata