Con Edison Storage LDG-00878 (LDG-00878)

Con Edison Storage LDG-00878 is a 4.3 MW battery interconnection project in Westchester, New York with a current status of operational. It is proposed to connect at Mohansic / 16W02.

4.3 MWCapacity
OperationalStatus
Yorktown HeightsMarket
BatteryTechnology

Project facts

Canonical nameCon Edison Storage LDG-00878
Queue IDLDG-00878
Statusoperational
Source statusInterconnected
MarketYorktown Heights
TechnologyBattery
Capacity4.3 MW
StateNew York
CountyWestchester
Point of interconnectionMohansic / 16W02
Requested (queue) date
Proposed in-service date
Operational date2024-12-06
Withdrawn date
DeveloperEnel X
Utility / transmission ownerCon Edison

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-05new_projectoperationalhigh

Explore related data

Source last checked2026-08-05
Data last materially changed2026-08-05
Page data generated2026-08-27

Provenance: ny-storage. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata