Con Edison Storage LDG-01269 (LDG-01269)

Con Edison Storage LDG-01269 is a 1.0 MW battery interconnection project in Westchester, New York with a current status of operational. It is proposed to connect at Buchanan / 13W80.

1.0 MWCapacity
OperationalStatus
Cortlandt ManorMarket
BatteryTechnology

Project facts

Canonical nameCon Edison Storage LDG-01269
Queue IDLDG-01269
Statusoperational
Source statusInterconnected
MarketCortlandt Manor
TechnologyBattery
Capacity1.0 MW
StateNew York
CountyWestchester
Point of interconnectionBuchanan / 13W80
Requested (queue) date
Proposed in-service date
Operational date2021-12-27
Withdrawn date
DeveloperDirect Energy Solar
Utility / transmission ownerCon Edison

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-05new_projectoperationalhigh

Explore related data

Source last checked2026-08-05
Data last materially changed2026-08-05
Page data generated2026-08-27

Provenance: ny-storage. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata