Con Edison Storage LDG-01807 (LDG-01807)

Con Edison Storage LDG-01807 is a 4.0 MW battery interconnection project in Westchester, New York with a current status of operational. It is proposed to connect at Ossining West / 6W61.

4.0 MWCapacity
OperationalStatus
OssiningMarket
BatteryTechnology

Project facts

Canonical nameCon Edison Storage LDG-01807
Queue IDLDG-01807
Statusoperational
Source statusInterconnected
MarketOssining
TechnologyBattery
Capacity4.0 MW
StateNew York
CountyWestchester
Point of interconnectionOssining West / 6W61
Requested (queue) date
Proposed in-service date
Operational date2024-12-11
Withdrawn date
DeveloperEnel X
Utility / transmission ownerCon Edison

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-05new_projectoperationalhigh

Explore related data

Source last checked2026-08-05
Data last materially changed2026-08-05
Page data generated2026-08-27

Provenance: ny-storage. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata